top of page
Search

[New Case Study] Cable Installation at Selwyn Snow Resort (AUS)



A challenging environment for cable installation

Nestled in the Snowy Mountains, Selwyn Snow Resort is undergoing significant infrastructure upgrades, including the installation of new electrical and communication cables. Operating in alpine conditions presents unique challenges: extreme weather, rocky terrain, and the need for minimal environmental disruption.

This is where Marais Laying NZ stepped in, bringing its expertise in trenching and cable installation to ensure a fast, efficient, and precise deployment.


Innovative trenching solutions for high-altitude conditions

Using our state-of-the-art Tesmec trenching machines, we executed:

Precise micro-trenching – minimizing ground disturbance in fragile alpine terrain

Efficient cable laying – ensuring rapid deployment despite challenging weather

Eco-friendly approach – reducing the environmental footprint of the operation.


Our advanced trenching technology allowed us to complete the project faster and with greater precision than traditional excavation methods, ensuring minimal impact on the surrounding landscape.


Delivering performance where it matters

At Marais Laying NZ, we pride ourselves on providing innovative, reliable, and sustainable solutions for complex infrastructure projects. Whether it's a high-altitude ski resort or an urban fiber optic deployment, our technology and expertise help our clients stay ahead.




Comments


Marais Laying New Zealand specialises in trenching and industrial cable laying, from large scale renewable projects and oil and gas pipelines, to telecommunications and power infrastructure.

© 2024 by Marais Laying New Zealand | All Rights Reserved

Terms of Use

  • LinkedIn
  • Facebook
bottom of page