BULK EXCAVATION - HARAPAKI WIN
Client: Hick Bros
​
Location: Harapaki wind farm - Napier
​
Service: Bulk excavation
​
Date started: June 2022
​
​
Scope of work
Bulk excavation for access roads and turbine foundations.
​
​
Solution
TESMEC TRS1150XHD Surface Miner, extract material at an average of 160-180t per hour.
​
​
Results
The TESMEC TRS1150XHD surface miner has been performing under these ground conditions with a high productivity rate and twice as efficient than a conventional excavation and rock breaker.
​
​
Key facts:
-
1600-1800t per hour
-
Downcutting mode
-
TESMEC TrenchIntel, 3D GPS guidance system
-
TESMEC TrenchTronic 5.0, machine electronic control system, and optimised digging parameters.
​
Key equipment used: